Compliance Map
Parts A–T Compliance Map
The engine determines which Building Regulation Parts apply to your project. You assign each Part to the responsible designer. They submit evidence. You review, raise queries, confirm compliance. The review trail becomes your evidence. If a Part has linked design interfaces that haven't been resolved, it's blocked from confirmation.
Confirmed
Under review
Query raised
Not assigned
Interface Management
Design Interface Management
Structural depths shape ceiling voids. Voids shape M&E routing. Routing shapes fire compartmentation penetrations. COMP³ tracks every interface — a Part can't be confirmed while a linked interface is unresolved. The single biggest driver of Gateway 2 rejections.
Interface typeStructural ↔ Fire
Parts affectedA, B
DesignersStructural Eng · Fire Eng
StatusResolution Proposed
★ Differentiator
AI-Assisted Evidence Intelligence
It doesn't just store your evidence. It reads it.
Three checks fire on every upload. All advisory. None blocking.
01Per-document QA
A fire strategy on Part B is checked for means of escape, compartmentation, external fire spread, and firefighter access. Missing items get flagged.
02Cross-Part consistency
Compares assumptions across designers — Part A's slab depth vs Part L's ceiling void vs Part B's compartmentation — and flags where the design doesn't add up.
03Competence matching
A designer assigned Part B without a fire-safety competence record? Flagged. You decide what to do.
We haven't seen another tool that does this.
Document checkers read one file at a time. Form-fillers don't read content at all.
⚠ Cross-Part inconsistency · Riverside Tower
Part A structural submission assumes a 300mm floor slab. Part L energy submission assumes a 200mm ceiling void. At the stated 2.7m floor-to-floor height, these may not be compatible with Part B compartmentation locations.
Escalate to designers
Dismiss with justification
View linked evidence
Advisory only
Doesn't block uploads
Doesn't override judgement
HRB · Gateway 2
Gateway 2 Readiness
A dedicated view tracks BRCS, Fire & Emergency File, Change Control, Mandatory Occurrence Reporting procedures, competence evidence and drawings. Validation readiness (is it present?) is shown separately from approval readiness (is it internally consistent?).
BRCS82%
Fire & Emergency File64%
Change Control Plan48%
Competence evidence91%
Mandatory Occurrence Reporting22%
Non-HRB
Full Plans Support
BRPD applies to every project with more than one contractor (or where that's reasonably foreseeable) — not just HRBs. For non-HRBs, COMP³ generates a Full Plans Compliance Summary for Building Control. Different output, same reasoning engine.
Full Plans Compliance Summary v2 · Birch Mews
Generated
Change Management
Design Change Management
Design changes don't stop at first submission. Log a change — COMP³ flags the affected Parts, the designers who need to respond, and the evidence that needs updating. For HRBs, this feeds straight into your Change Control Plan.
CHG-014 · Facade buildup revisionParts B, L · 3 designers
CHG-015 · Refuge dimensionsPart M · 1 designer
CHG-016 · MEP riser relocationParts B, F, J · 4 designers
Recurring Duties
Recurring Duty Management
Some BRPD duties are processes, not documents — fortnightly coordination reviews, RIBA stage-gate reviews, designer monitoring. COMP³ models them as recurring actions with configurable cadence. Every log entry becomes timestamped evidence. The trail builds itself.
M
T
W
T
F
S
S
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Dual Role Clarity
CDM PD / BRPD Dual Role
Hold both CDM PD and BRPD on one project? COMP³ shows CDM duties separately from Building Regs duties. Role confusion is one of the most common Gateway 2 rejection causes.
CDM 2015 · Health & Safety
PCI compilation
Designer risk coordination
Pre-construction info pack
BSA · Building Regs
Parts A–T coordination
Design interface management
BRCS / Gateway 2
Handover
BRPD → BRPC Handover
At design sign-off, COMP³ auto-generates a draft handover pack from your Part-by-Part records, interface resolutions, and fire strategy coordination. The BRPC sees what's approved, which Parts apply, what evidence is still needed, and the assumptions underpinning the design. No more inferring from drawings.
Design Compliance Handover Pack · v1 draft
Auto-generated
Reporting
Export & Reporting
Compliance status reports, Gateway 2 submission index, pre-populated BRCS template, audit trail export. The outputs BRPDs share with clients, Building Control, and the BSR.
BRCS_RiversideTower_v1.pdfExport
Gateway 2 Submission Index.xlsxExport
Audit_Trail_Q2_2026.csvExport
Compliance_Status_Report.pdfExport